On-going Schemes as on 30-01-2019
1. Flood Management Programme (F.M.P)
Sl No |
Name of Schemes |
Esstt. Amount |
Ref. of Administrative Approval |
Remarks |
1 |
A/E measures to protect B/dyke on R/B of river Brahmaputra from Adabari to Kukarjan including of the dyke from Ch. 26th Km to ch. 33rd Km under F.M.P |
Rs. 1366.12 L |
WR(C)187/2013/47 Dt. 21-10-2014 |
Work is in progress (Upto Dec’2018) |
2 |
A/E measures to Pagladia L/B embankment from Dusutimukh to Adabari including strengthening & widening of the dyke at different reaches: At 1st Km( Kathalghopa), at 4th Km (Hablakha) & at 6th Km (Bullutpar) under F.M.P |
Rs. 1444.92 L |
WR(C)395/2012/45 Dt. 22-10-2014 |
Work is in progress (Upto Dec’2018) |
3 |
M/E along Both Bank of river of Mora Pagladia from N.H. way to Tihu Akhara P.W.D. Road (Raising and strengthining of embankment including anti erosion works on Both bank at different reaches under F.M.P |
Rs. 1800.64 L |
WR(C)266/2013/47 Dt. 22-10-2014 |
Work is in progress (Upto Dec’2018) |
2. NABARD
Sl No |
Name of Schemes |
Esstt. Amount |
Ref. of Administrative Approval |
Remarks |
1 |
Anti-erosion measures against the bank erosion at different reaches of river Tihu (Bhadrakuchi and its adjoining areas) under RIDF XXIII |
Rs. 200.00 L |
WR(C)501/2017/05 DT. 23-11-2017 |
Work is in progress (Upto Dec’2018) |
2 |
Anti erosion measures to protect the R/B of B/Dyke from Adabari to Kukarjan (at Saikiapara area) from Ch. 5830m to Ch 7270m under RIDF XXIII |
Rs. 325.00 L |
WR(C)512/2017/05 DT. 23-11-2017 |
Work is in progress (Upto Dec’2018) |
3. SDRF
Sl No |
Name of Schemes |
Esstt. Amount |
Ref. of Administrative Approval |
Remarks |
1 |
Immediate measures to M/E along B/B of Nadla Drainage Channel from Rly. Line to its out fall at river Buradia (CLosing of miscreant cut/ breach at Ch. 6.50th Km L/B near village Purni including restoration works at breach like damage portion of the embankment) under SDRF for 2017-18 |
Rs. 320.00 L |
RGR.(RRR)996/2017/74 Dt.05-01-2018 |
Work is in progress (Upto Dec’2018) |
2 |
Immediate measures to restore the flood damages to Hatipota, Soneswarjan, Pukhra on L/B of river Buradia for 2017-18 under SDRF |
Rs. 180.00 L |
RGR(RRR)994/2017/72 Dt.05-01-2018 |
Work physically completed |
3 |
Immediate measures to restoration the flood damages of B/dyke due to diversion of channel of river Brahmaputra at Kaptola and its adjoining area 2017-18 under SDRF |
Rs. 195.00 L |
RGR.(RRR).992/2017/64 Dt. 06-01-2018 |
Work physically completed |
4 |
Immediate measures to restore of flood damages at Chatemari and its adjoining area due to diversion of channel of river Brahmaputra under SDRF for 2017-18 |
Rs. 210.00 L |
RGR.(RRR).288/2018/64 Dt. 05-05-2018 |
Work physically completed |
5 |
Immediate measures to M.E along B/B of river Noona from ‘0’ point of existing embankment to its outfall (Recoupment of damaged section from Ch. 9375m to Ch. 18400m on R/B- D/S) for 2017-18 under SDRF |
Rs. 175.00 L |
RGR.(RRR).275/2018/52 Dt. 26-04-2018 |
Work physically completed |
6 |
Immediate measures to protect the R/B of river Pagladia from Sonkuriha to Bijulighat at 32nd Km Gangapukhuri area for the year 2017-18 under SDRF |
Rs. 95.00 L |
RGR.(RRR)./993/2017/64 Dt. 06-01-2018 |
Work physically completed |
7 |
Immediate measures to restore the flood damages on R/B of river Noona from ‘0’ point of existing embankment to G.K. Ali (Restoration works from Ch. 0M to Ch. 3900M on R/B) for 2017-18 under SDRF |
Rs. 200.00 L |
RGR.(RRR).275/2018/55 Dt. 26-04-2018 |
Work is in progress (Upto Dec’2018) |
8 |
Immediate measures to M.E. along B/B of river Pagladia from G.K. Ali to N.T. Road -Ph-I (U/S) (Bank Restoration works at 3rd Km Pub-Barsiral and at 7th Km Keherua on L/B) for 2017-18 under SDRF |
Rs. 150.00 L |
RGR.(RRR).275/2018/54 Dt. 26-04-2018 |
Work is in progress (Upto Dec’2018) |